The Old forge was probably last worked on in the 1980s and no lime plaster was remaining on the walls all rooms where plastered using cement plasterboard or gypsum plaster. RJM Recommend that all modern materials should be removed and the property should be refurbished in Lime plaster timber lath. This house was very cold and damp from the cement floors and unbreathable materials. We removed all cements and gypsum coatings and replaced with lime floors Lime pointed walls All timber work strengthened Steels added to allow exposed timber beams and vaulted ceilings to 1st floor rooms. In the main forge we restored the Forge, Lime plastered between roof timbers and installed a breathable floor with reclaimed sand stone.